玻璃窑炉工程

Case

Product Categories

Contact Us

1493183946284529.jpg

Jiangsu Shuyang Jinda New Energy Co., Ltd. successfully completed the hot repair of kiln bricks.

Your current location: Home >> Case >> Engineering Case

Jiangsu Shuyang Jinda New Energy Co., Ltd. successfully completed the hot repair of kiln bricks.


Jiangsu Shuyang Jinda New Energy Co., Ltd. successfully completed the hot repair of kiln bricks.

Jiangsu Shuyang Jinda New Energy Co., Ltd. successfully completed the hot repair of kiln bricks.


Jiangsu Shuyang Jinda New Energy Co., Ltd. is the earliest single-kiln five-line photovoltaic calendered glass manufacturer with the largest tonnage in China. The company's calendering equipment is all imported, and at the same time, it has a perfect deep processing production line. The high-quality photovoltaic glass produced by the company has been stably supplied to domestic photovoltaic enterprises for a long time.







Bricking the wall of kiln is the most important maintenance work in the operation of kiln. This brick-helping is a secondary brick-helping for the tank wall, which not only helps the tank wall of 1 # 4 # 5 # 6 # small furnaces on both sides, but also removes the original brick-helping for the tank wall of 2 # 3 # small furnaces, and then carries out secondary brick-helping. The project is difficult, and there is the risk of material escaping from the pool wall at any time. The company concentrated the most superior technical force, conducted a second field survey on the site, and measured the erosion of the original pool wall in thermal state, grasped the actual situation of the original pool wall, and formulated a well-thought-out construction plan. The project started on November 16, 2016. According to the owner's requirements, 2 # 3 # small furnaces on both sides went down to the pool wall for 24-hour uninterrupted operation, and the overall hot repair project took 7 days to complete all the brick-helping work. The hot repair project did not affect the production. At present, the kiln is running normally.





Tags:Glassfurnacedesign

Share